SC Preußen Muenster - Mixed Zone

The project in brief.

Client:
SC Preußen 06 GmbH & Co. KGaA
Location:
Muenster, Deutschland
Realization:
1. Quartal 2021
Construction task:
Design, planning and construction

The goal was clear: to turn the dreary mixed zone into a space where people can feel comfortable and play sports. The mixed zone is not only the area where the press representatives receive the athletes after the games, but also the area that leads to their dressing room, in Münster both on match days and on training days. The club has formulated that on match days a different look should get the players in the mood for the game, this task was created by modern, controllable lighting. On match days, this shines indirectly in the green club color, while during the week the dimmable light is used during athletics sessions.

Apart from the lighting, the most striking change is the floor. A running track connects the long cubicle aisles; from now on, performance diagnostics can take place here under consistent conditions. The large area where interviews take place on game day shines in a grass-green color with white lines and is used for soccer tennis on training days. Mirrors on the walls provide the opportunity for athletes to check and correct themselves during training sessions. The visual highlight is the eagle that greets the players before they go out onto the field.

After the design phase and technical planning, the complete conversion was completed in a very short time. Today, press representatives, junior teams and professionals alike are delighted with the new facilities.

"The mixed zone is now also our athletics area. The controllable lighting in particular creates a special atmosphere on game days."

- Peter Niemeyer Sports Director SC Preußen Münster