University Hospital Münster Tower West

The project in brief.

Client:
UKM Infrastruktur Management GmbH
Location:
Münster
Realization:
11/2020 – 11/2020
Construction task:
Cavity floor, extremely short realization period

Münster University Hospital stands for modern patient care through the best possible diagnostics, therapy and nursing. In order to meet this high standard even during the pandemic, a Corona ward was specially set up.

From commissioning to execution, it took just three weeks for goracon to install the cavity floor for the infirmary made of non-combustible material in a façade mopping room. Special times just require special commitment and fast action. With goracon, they always have a reliable partner at their side.

"In order to safeguard the Corona-related functional processes, a corridor connection was implemented in the façade gap in a time-critical manner and under Corona protection measures without any problems."

- Bernd Winking (Team Leader Construction, UKM IM GmbH)